MDMSDEALER MANAGEMENT SYSTEM

Time and Materials Billing: How It Works for Equipment Dealers

By MDMS Team · 21 October 2026

Time and Materials Billing: How It Works for Equipment Dealers

Time and Materials Billing: How It Works for Equipment Dealers

Service manager checking repair hours and parts

Time and materials (T&M) billing means you charge the customer for the labour hours actually worked and the parts and consumables actually used, rather than a price agreed before the job starts. For an equipment dealer, it is the normal way to bill workshop repairs, field service call-outs and many hire-related jobs, because nobody knows what is wrong with a machine until a technician has it open. Done well, T&M protects your margin and keeps customers informed. Done badly, it produces disputed invoices, unbilled hours and a BAS full of surprises.

This guide covers how T&M works in a dealership, how to set rates and parts markup, what an Australian tax invoice must show, when fixed price is the better choice, and where AI helps with the paperwork.

Moderndms
moderndms.com.au
Keep Service Billing in Sync
MDMS connects service and parts workflows in one dealer management system, helping equipment dealerships streamline the work behind T&M billing.
Book a demo

TL;DR

  • T&M bills actual labour hours at an agreed rate plus parts and materials used, usually with a stated markup. It suits work where scope is unknown at the start.
  • Fixed price suits repeatable, well-defined jobs such as scheduled services. Many dealers run both, and the choice should follow how predictable the job is.
  • If you are registered for GST, your invoices must meet ATO tax invoice rules, including the ABN, a description with quantities and the GST amount.
  • Most T&M leakage happens between the workshop floor and the invoice: unrecorded time, parts issued but not billed, and rates that were never updated.
  • AI is useful for drafting quotes, follow-ups and invoice lines, provided a person approves anything that commits money.

Table of Contents

What time and materials billing means

A T&M arrangement has two billing streams:

  1. Time: hours worked by technicians, billed at an hourly or daily rate. The rate usually covers wages, overheads and margin, not just pay.
  2. Materials: parts, consumables, freight and sublet work, billed at cost plus an agreed markup or at list price.

The customer agrees to the method and the rates, not the final total. That is the whole difference from a fixed price quote. Because the total is not known upfront, good T&M relies on three things: clear rates, an estimate (or at least a not-to-exceed figure) and a visible record of what was done.

In a dealership, T&M typically shows up as:

  • Workshop repairs where diagnosis comes first
  • Field service call-outs with travel time
  • Warranty work billed to a supplier at agreed labour rates
  • Modifications, fit-outs and commissioning beyond the base machine price
  • Damage or cleaning charges after a hire

How a T&M job flows in a dealership

The job passes through a handful of hands, and each handover is a place where billable detail gets lost. A clean flow looks like this.

  1. Request and estimate. The service manager records the fault, gives an estimate range and gets approval to proceed. Where the estimate may be exceeded, the customer agrees to be contacted first.
  2. Work order opened. The job is linked to the customer, the machine and its serial number, so the history stays with the asset.
  3. Time captured as work happens. Technicians log time against the work order, ideally from the workshop floor or the field, not from memory at the end of the week.
  4. Parts issued to the job. Parts leave the shelf against the work order number, so stock and billing agree.
  5. Review before invoicing. The manager checks hours against the estimate, adds sublet and freight, and flags variances.
  6. Invoice and payment. A GST-compliant tax invoice goes out, with the labour and parts lines the customer can follow.

The point of an integrated system is that data should travel once: the fault description, hours and parts entered at step 2 to 4 become the invoice at step 6 without anyone retyping them. When each step lives in a separate spreadsheet or inbox, the invoice is assembled from memory and the gaps are usually in your customer’s favour.

Setting the labour rate and the parts markup

Build the rate from real costs

A charge-out rate is not a wage with a bit added. It has to recover wages, on-costs such as super and leave, workshop overheads, tooling, vehicles and a margin, spread across the hours that are genuinely billable. A technician who is on site for 38 hours a week rarely bills 38. Training, waiting on parts and internal jobs all take hours that nobody pays for.

Costs and billable hours behind charge-out rate

This charge-out rate formula built on real job time is written for tradies, but the logic carries over: start from the hours you actually bill, not the hours you pay. Then check the result against what your region will bear.

Use rate tiers where they make sense

Most workshops run more than one rate. Common splits include:

Rate type When it applies Why
Workshop rate Work done at your premises Lowest overhead per hour
Field rate On-site service at the customer’s yard or farm Covers vehicle, tooling and exposure
After-hours rate Breakdowns outside normal hours Compensates penalty wages
Travel Time to and from site Often billed as time or per kilometre

Write these into the customer’s account terms so the rate on the invoice is never a surprise.

Decide how parts are marked up

Materials are commonly billed at purchase price plus freight, then a markup to cover handling, storage and the cost of carrying stock. Whatever you choose, apply it consistently. Many dealers use a sliding scale so that low-cost consumables carry a higher percentage than high-value components, and keep a separate treatment for sublet work. Customers with trade accounts may have agreed discounts, which your system should apply automatically rather than leave to whoever is at the counter.

The labour-first approach to job costing is a useful discipline here: know what each job really cost in hours before you judge whether the parts margin is carrying the labour.

Decide how parts are marked up — overview diagram

What your invoice must show in Australia

If your dealership is registered for GST, T&M invoices carry the same obligations as any other sale. The ATO’s tax invoice rules say you must give a tax invoice within 28 days if a customer asks, unless the sale is $82.50 or less including GST. The detail required depends on the sale amount. For sales over $82.50, the invoice must identify your business and ABN, the date, a description of what was sold including quantities, and the GST amount. For sales of $1,000 or more, you must also show the buyer’s identity or ABN.

For T&M that has practical consequences:

  • Show hours and rate as separate quantities, such as 6.5 hours at your workshop rate, not a single lump labour line.
  • List parts with quantities, so the “description including quantity” requirement is met without effort.
  • Show GST clearly per line or as a total, in line with the ATO guidance. The GST registration page on business.gov.au explains that GST is 10% on most goods and services, which means one-eleventh of a GST-inclusive price is the tax.
  • Keep the buyer’s ABN on file for accounts, so large jobs are never held up.

The ATO guidance on setting up business invoices also notes that what you call the document depends on whether you are registered for GST. If you want to see how GST plays out on specific dealer work, our articles on GST on repairs and GST on equipment rentals go through the common traps, and the seven demo checks help you test whether software handles it properly.

Time and materials vs fixed price

The real question is who carries the risk of the estimate being wrong. Under fixed price, you do. Under T&M, the customer does. Neither is better in general. Match the method to the job.

Factor Time and materials Fixed price (flat rate)
Best for Diagnosis, repairs, unknown scope, changing requirements Scheduled services, repeatable jobs, defined scope
Who carries overrun risk Customer Dealer
Customer certainty Lower, needs estimates and updates Higher, one number
Dealer margin protection Strong, as hours and parts are billed as used Depends on estimating accuracy
Admin effort Needs accurate time and parts capture Needs accurate costing before quoting
Dispute risk Over unexplained hours or parts Over what is included or not

A practical hybrid works well for dealers:

  • Fixed price for service packages on common machines, where you know the hours from history.
  • T&M with an estimate and a cap for repairs. Agree to contact the customer before exceeding the estimate by a set percentage.
  • Fixed price per period or per metered unit for rental and usage-based work. Our guides on rental rate cards and meter-based billing cover those cases.

If your work includes ongoing servicing for fleets, a recurring arrangement may suit better than job-by-job billing. Our maintenance contract software page shows how those agreements are set up alongside T&M extras.

Contracts, progress payments and getting paid

A T&M arrangement is only as strong as the terms behind it. The business.gov.au guidance on preparing a contract stresses clear payment terms, such as due dates and payment methods, and a clear description of the work. For T&M, write down:

  • Hourly or daily rates, and when each applies
  • How and when materials are charged, and the markup basis
  • The billing cycle, such as weekly, fortnightly or monthly
  • Whether an estimate is a cap, a guide or nothing binding
  • How variations are approved
  • Whether GST is included or added

For longer jobs, progress billing keeps cash flowing so you are not funding a month of labour and parts before the first invoice. Business.gov.au also covers laws affecting contracts, including security of payment laws for the building and construction industry. If you work on construction sites, check how those laws apply to your jobs before you rely on standard terms alone.

Where T&M billing leaks money

We see the same handful of problems in dealership workshops:

  • Unrecorded time. Fifteen minutes here and there on phone calls, test runs and travel adds up to hours a week.
  • Parts issued but not billed. A technician takes a filter and a seal from the shelf, the work order is closed, and the parts never reach the invoice.
  • Stale rates. Costs rose, the labour rate did not.
  • Estimates that never get revisited. The job doubles in scope, the customer is not told, and the invoice is disputed.
  • Delayed invoicing. The longer the gap, the less the customer remembers and the slower they pay.
  • GST errors. Mixed GST-free and taxable lines, or missing details on invoices over the threshold.

Each of these is a process gap, not a people problem. The fix is to capture time and parts at the moment they happen, against the work order, and to review variances before the invoice leaves.

How software supports T&M

What you need from your system for T&M is quite specific:

  1. Work orders tied to the customer, machine and serial number
  2. Time capture from the workshop and the field, including where mobile coverage is poor
  3. Parts issued against jobs, with stock updated at the same time
  4. Rate cards and markup rules applied automatically
  5. Estimate versus actual comparison before invoicing
  6. GST-compliant invoices that sync to your accounts

The service management software and our workshop management software guide set out what to look for. Parts issued to jobs are handled through parts and warehouse management, and if you hire out machines, rental contract and fleet software keeps hire charges and damage billing in one place.

AI in a dealer management system and ERP

AI is changing the administrative side of T&M more than the billing logic itself. The rules stay the same: rates, markup, GST. What changes is how much typing sits between the job and the invoice.

Practical uses in a DMS or ERP include:

  • Drafting quotes and estimates from the machine, fault description and past similar jobs
  • Writing invoice lines in plain language from technician notes, so the customer can follow the work
  • Preparing follow-ups on open quotes and overdue invoices
  • Flagging variances, such as hours well above the estimate or a closed job with no parts
  • Searching history for the last time a machine had the same fault

The model that works is one where AI prepares and a person approves. Practitioners who write about AI in dealer operations describe the most successful setups as human-in-the-loop, where the system handles the administrative heavy lifting and managers keep control of financial commitments. We agree. A drafted quote is a time saver. A quote sent without review is a liability.

AI also depends on clean data. If your work orders, parts and rates sit in disconnected tools, there is nothing reliable for it to draw on. That is why an AI layer makes most sense on top of a single platform that already holds the full job lifecycle.

MDMS AI pricing

MDMS AI is priced at $449 AUD per month, and each AI-enabled user is $29 AUD per month per seat. That lets you switch it on for the people who prepare quotes and invoices, such as service managers and parts staff, rather than the whole team. Details are on the MDMS site.

Our view: bill what happened, once

We built MDMS for equipment dealers, and our view on T&M is simple. The invoice should be the by-product of good work records, not a separate piece of writing at month end.

Three things follow from that:

  • Start where your pain is. If unbilled parts are your biggest leak, begin with the service and parts modules rather than replacing everything at once. MDMS is modular, so you adopt what you need first.
  • Own your data. Your job history and rates are your commercial record. You should be able to take them with you, so we do not lock data in.
  • Keep AI on a short leash. Let it draft, summarise and flag. Keep approval with the person who answers for the number.

A dealership that records time and parts as they happen does not need to argue about T&M invoices, because the invoice explains itself.

— ModernDMS

Try it in your own workshop

MDMS plans start at $59 AUD per month per module, including Service Workshop, Parts, CPQ & Quoting, Field Service and Rental, with the General Ledger & Operations module and the Equipment Dealer Suite each at $259 AUD per month. Data upload is $259 AUD one-off per module and a training package is $499 AUD one-off per module. See full pricing, or start with the features overview to map modules to your biggest billing gaps.

FAQ

What is the difference between time and materials and fixed price?

Under time and materials you pay for the hours worked and the parts used, so the final total depends on what the job needed. Under fixed price you agree one number upfront and the dealer absorbs any overrun. T&M suits repairs and unknowns, and fixed price suits repeatable, well-defined work.

How do you charge for time and materials?

Agree a labour rate, how parts are priced and the billing cycle in writing before work starts. Record hours and parts against the work order, then invoice the actual quantities with GST shown. An estimate or approval threshold keeps the customer informed.

Do I need to show GST on a T&M invoice?

If you are registered for GST, yes. The ATO requires tax invoices for sales over $82.50 to show your ABN, the date, a description including quantities and the GST amount. For sales of $1,000 or more, the buyer’s identity or ABN is also required.

How much markup should I put on parts?

There is no single correct figure. It should cover handling, storage, carrying cost and margin, and many dealers use a sliding scale by part value. Set it by looking at your actual costs and apply it through your system so it is consistent.

Can AI handle time and materials billing?

AI can draft quotes, write invoice descriptions and flag unusual hours or missing parts. A person should still approve anything that commits the business financially. It works best when job, parts and rate data already live in one system.

Sources